{"id":900,"date":"2024-08-02T13:17:00","date_gmt":"2024-08-02T13:17:00","guid":{"rendered":"https:\/\/gmb.com\/?post_type=work&#038;p=900"},"modified":"2025-01-23T17:04:00","modified_gmt":"2025-01-23T17:04:00","slug":"hudsonville-high-school-fieldhouse","status":"publish","type":"work","link":"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/","title":{"rendered":"Hudsonville Public Schools &#8211; Fieldhouse"},"content":{"rendered":"\n<section class=\"single-post-content__section \">\n    <div class=\"acf-innerblocks-container\">\n\n<div class=\"wp-block-group single-post-content-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"pixels-decoration pixels ne three-three-two\">\n<\/div>\n\n\n<div style=\"height:6rem\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading work-secondary-title has-gmb-purple-color has-text-color has-link-color has-figtree-font-family wp-elements-d4d13f69d0adfa911b682d226596f75d\" style=\"font-size:2rem\">High School Fieldhouse<\/h2>\n\n\n\n<p class=\"work-location-date\" style=\"padding-bottom:2rem;font-size:20px\">Hudsonville, MI | Completed 2023<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-deeb956a wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66%\">\n<p style=\"padding-top:0;padding-bottom:var(--wp--preset--spacing--50);font-size:32px;line-height:1.1\">Since 2018, Hudsonville Public Schools has added around 125 students per year in the district and needed educational facilities to accommodate their current and future growth. As part of the district\u2019s long-term master plan, the community approved a 2019 bond proposal to build new school facilities, including a new school for fifth and sixth graders, as well as renovate and add onto existing buildings, to address the district\u2019s population needs. The high school has undergone a complete transformation to create additional classrooms, expand athletics and arts facilities, and connect campus buildings with multifunctional spaces.<\/p>\n\n\n\n<p>With a total of 104,000 square feet, the new Hudsonville Fieldhouse serves as the new athletics and training hub for the high school. Located south of the existing high school building, the fieldhouse includes locker rooms, a 1\/9 mile running track, two-levels of fitness and strength areas, a multipurpose tennis court, and three full size basketball courts for athletics events with spectator seating for 3,700 people. The unique top-loading design of the fieldhouse delivers a 360-view of the court floor and connects spaces on the upper level, making the facility ideal for hosting competitions, expositions, and community events. High-performance lighting in the fieldhouse provides an elevated spectator experience complemented by ample daylighting, a center-hung video board, and interactive district branding throughout.<\/p>\n\n\n\n<div style=\"height:32px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group is-content-justification-left is-layout-constrained wp-container-core-group-is-layout-73db555c wp-block-group-is-layout-constrained\"><section class=\"higherup-accordion__section\">\n    <div class=\"higherup-accordion__wrapper\">\n        <div class=\"acf-innerblocks-container\">\n\n<div class=\"higherup-accordion__tab-container\">\n    <div class=\"acf-innerblocks-container\">\n\n<button id=\"\" class=\"accordion-headline-container\" aria-controls=\"headline-content\" aria-expanded=\"false\">\n    <div class=\"acf-innerblocks-container\">\n\n<h3 class=\"wp-block-heading accordion-headline\">Project News &amp; Awards<\/h3>\n\n<\/div>\n<\/button>\n\n\n<div id=\"headline-content\" class=\"accordion-content-container\">\n    <div class=\"acf-innerblocks-container\">\n\n<p class=\"accordion-tab-content\"><a href=\"https:\/\/www.fox17online.com\/news\/local-news\/lakeshore\/ottawa\/hudsonville-community-to-celebrate-massive-139m-expansion-projects\" target=\"_blank\" rel=\"noreferrer noopener\">Hudsonville to celebrate massive, $139M high school expansion projects<\/a><\/p>\n\n\n\n<p class=\"accordion-tab-content\"><a href=\"https:\/\/www.fox17online.com\/news\/local-news\/lakeshore\/ottawa\/hudsonville-high-school-holds-ribbon-cutting-for-new-fieldhouse-unity-christian-also-building-expansion\" target=\"_blank\" rel=\"noreferrer noopener\">Hudsonville High School holds ribbon cutting for new fieldhouse<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/www.mlive.com\/news\/grand-rapids\/2025\/01\/west-michigan-school-wins-national-award-for-its-265m-sports-facility.html\">West Michigan school wins national award for its $26.5M sports facility<\/a><\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n    <\/div>\n<\/section><\/div>\n\n\n\n<div style=\"height:32px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><div class=\"taxonomy-focus focus-list-block wp-block-post-terms\"><span class=\"wp-block-post-terms__prefix\">Focuses<br><\/span><a href=\"https:\/\/gmb.com\/focus\/community-space\/\" rel=\"tag\">Community Space<\/a><span class=\"wp-block-post-terms__separator\">, <\/span><a href=\"https:\/\/gmb.com\/focus\/pre-bond-campaign-management\/\" rel=\"tag\">Pre-Bond\/Campaign Management<\/a><span class=\"wp-block-post-terms__separator\">, <\/span><a href=\"https:\/\/gmb.com\/focus\/sports-recreation\/\" rel=\"tag\">Sports &amp; Recreation<\/a><\/div><\/div>\n<\/div>\n<\/div>\n\n<\/div>\n<\/section>\n\n\n<figure class=\"wp-block-gallery alignfull has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"903\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N173_casestudy-1024x682.jpg\" alt=\"\" class=\"wp-image-903\" srcset=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N173_casestudy-1024x682.jpg 1024w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N173_casestudy-300x200.jpg 300w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N173_casestudy-768x512.jpg 768w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N173_casestudy.jpg 1400w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"904\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N244_casestudy-1024x682.jpg\" alt=\"\" class=\"wp-image-904\" srcset=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N244_casestudy-1024x682.jpg 1024w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N244_casestudy-300x200.jpg 300w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N244_casestudy-768x512.jpg 768w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N244_casestudy.jpg 1400w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"906\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N236_casestudy-1024x682.jpg\" alt=\"\" class=\"wp-image-906\" srcset=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N236_casestudy-1024x682.jpg 1024w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N236_casestudy-300x200.jpg 300w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N236_casestudy-768x512.jpg 768w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N236_casestudy.jpg 1400w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"902\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N177_casestudy-1024x682.jpg\" alt=\"\" class=\"wp-image-902\" srcset=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N177_casestudy-1024x682.jpg 1024w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N177_casestudy-300x200.jpg 300w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N177_casestudy-768x512.jpg 768w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N177_casestudy.jpg 1400w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"905\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N264_casestudy-1024x682.jpg\" alt=\"\" class=\"wp-image-905\" srcset=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N264_casestudy-1024x682.jpg 1024w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N264_casestudy-300x200.jpg 300w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N264_casestudy-768x512.jpg 768w, https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N264_casestudy.jpg 1400w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8e92eae2 wp-block-columns-is-layout-flex\" style=\"margin-top:4rem;margin-bottom:4rem\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"padding-right:0;padding-left:0;flex-basis:75%\">\n<p>A new campus connector and secure entrance joins the dispersed high school buildings into one connected facility with a single point of entry. A centralized administration suite and counseling offices are housed adjacent to the connector and across from the new academic commons area. An enclosed bridge connects the campuses together over a river and adds eight new classrooms in the connection area. The school\u2019s current office has been transformed into a new home for the robotics program, and an expanded caf\u00e9 with streamlined serving, a new kitchen, and additional open space seating for up to 1,000 students creates flexible options for students. A choir addition brings 5,400 square feet of rehearsal space to the fine arts wing and includes sound-proof practice rooms, a large multipurpose ensemble room, storage space for the choir and theater, and a new hallway connecting the fine arts building to the main commons. Dedicated bus and vehicle drop off loops also improve traffic flow for the entire site and expanded parking areas now feature electric vehicle charging stations for students, staff, and visitors.<br><\/p>\n\n\n\n<p>It was important to the district to build spaces that reflected student talent, celebrated their successes, and reinforced the brand and culture of Hudsonville. The upgraded facility is one of the largest high school complexes in the state, with almost 580,000 square feet under one roof. Students and staff can now enjoy intentionally design spaces that are connected, flexible, intuitive, and inviting.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"tag-carousel__section alignfull\">\n    <div class=\"tag-carousel__wrapper\">\n        <div class=\"tag-carousel-swiper swiper\">\n            <div class=\"swiper-wrapper\">\n                                                <div class=\"swiper-slide\">\n                    <span class=\"tag-carousel__tag\"><a href=\"https:\/\/gmb.com\/work_tag\/ada-accessible\/\">ADA Accessible, <\/a><\/span>\n                <\/div>\n                                                <div class=\"swiper-slide\">\n                    <span class=\"tag-carousel__tag\"><a href=\"https:\/\/gmb.com\/work_tag\/design-workshops\/\">Design Workshops, <\/a><\/span>\n                <\/div>\n                                                <div class=\"swiper-slide\">\n                    <span class=\"tag-carousel__tag\"><a href=\"https:\/\/gmb.com\/work_tag\/dining\/\">Dining, <\/a><\/span>\n                <\/div>\n                                                <div class=\"swiper-slide\">\n                    <span class=\"tag-carousel__tag\"><a href=\"https:\/\/gmb.com\/work_tag\/extended-learning-areas\/\">Extended Learning Areas, <\/a><\/span>\n                <\/div>\n                                                <div class=\"swiper-slide\">\n                    <span class=\"tag-carousel__tag\"><a href=\"https:\/\/gmb.com\/work_tag\/learning-commons\/\">Learning Commons, <\/a><\/span>\n                <\/div>\n                                                <div class=\"swiper-slide\">\n                    <span class=\"tag-carousel__tag\"><a href=\"https:\/\/gmb.com\/work_tag\/technology\/\">Technology<\/a><\/span>\n                <\/div>\n                            <\/div>\n        <\/div>\n        <div class=\"swiper-button-prev tag-carousel-arrow-prev\"><\/div>\n        <div class=\"swiper-button-next tag-carousel-arrow-next\"><\/div>\n    <\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading is-style-heading-two-alternative\">Related work<\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-b23a18ed wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p>Explore our insights on branding, marketing, engineering, and architecture, tailored specifically to the higher education sector.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-purple-light\"><a class=\"wp-block-button__link wp-element-button\">View More<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<section class=\"work-listings__section alignfull\">\n    <div class=\"work-listings__wrapper\">\n        <div class=\"work-listings__container\">\n            <div class=\"swiper\">\n                <div class=\"swiper-wrapper\">\n                                                            <div class=\"swiper-slide\">\n                        <div class=\"results-card\">\n                            <a href=\"https:\/\/gmb.com\/work\/dekalb-school-district-428\/\">\n                                <div class=\"results-card-image-container work\">\n\n                                    <img decoding=\"async\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2025\/12\/BTP_3831-1024x681.jpg\" alt=\"\" class=\"results-card-image work\">\n                                <\/div>\n                                <div class=\"results-card-content-container\">\n                                    <div class=\"results-card__taxonomy-container\">\n                                        <span class=\"primary-text school\">K-12<\/span>\n                                        <span class=\"taxonomy-divider secondary-text\"> |\n                                        <\/span>\n                                        <span class=\"secondary-text service\">Architecture &amp; Engineering<\/span>\n                                    <\/div>\n                                    <h3 class=\"results-card-title\">DeKalb School District 428<\/h3>\n                                    <p class=\"work-card-headline\">Honoring a Legacy with a STEAM Education<\/p>\n                                <\/div>\n                            <\/a>\n                        <\/div>\n                    <\/div>\n                                                            <div class=\"swiper-slide\">\n                        <div class=\"results-card\">\n                            <a href=\"https:\/\/gmb.com\/work\/plainwell-community-schools\/\">\n                                <div class=\"results-card-image-container work\">\n\n                                    <img decoding=\"async\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2025\/09\/5_5098_N199_jpg-1024x683.jpg\" alt=\"\" class=\"results-card-image work\">\n                                <\/div>\n                                <div class=\"results-card-content-container\">\n                                    <div class=\"results-card__taxonomy-container\">\n                                        <span class=\"primary-text school\">Community, K-12<\/span>\n                                        <span class=\"taxonomy-divider secondary-text\"> |\n                                        <\/span>\n                                        <span class=\"secondary-text service\">Architecture &amp; Engineering<\/span>\n                                    <\/div>\n                                    <h3 class=\"results-card-title\">Plainwell Community Schools<\/h3>\n                                    <p class=\"work-card-headline\">Diving Into a New, State-of-the-Art Competition Pool<\/p>\n                                <\/div>\n                            <\/a>\n                        <\/div>\n                    <\/div>\n                                                            <div class=\"swiper-slide\">\n                        <div class=\"results-card\">\n                            <a href=\"https:\/\/gmb.com\/work\/west-ottawa-public-schools-riley-farms\/\">\n                                <div class=\"results-card-image-container work\">\n\n                                    <img decoding=\"async\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2025\/08\/5_4873_N26_jpg-1024x576.jpg\" alt=\"\" class=\"results-card-image work\">\n                                <\/div>\n                                <div class=\"results-card-content-container\">\n                                    <div class=\"results-card__taxonomy-container\">\n                                        <span class=\"primary-text school\">K-12<\/span>\n                                        <span class=\"taxonomy-divider secondary-text\"> |\n                                        <\/span>\n                                        <span class=\"secondary-text service\">Architecture &amp; Engineering<\/span>\n                                    <\/div>\n                                    <h3 class=\"results-card-title\">West Ottawa Public Schools<\/h3>\n                                    <p class=\"work-card-headline\">Nuturing Student Curiosity and Learning<\/p>\n                                <\/div>\n                            <\/a>\n                        <\/div>\n                    <\/div>\n                                                            <div class=\"swiper-slide\">\n                        <div class=\"results-card\">\n                            <a href=\"https:\/\/gmb.com\/work\/coopersville-area-public-schools\/\">\n                                <div class=\"results-card-image-container work\">\n\n                                    <img decoding=\"async\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2025\/08\/COOP_SOCIAL_MOCKUP_CROPPED-2-1024x676.png\" alt=\"\" class=\"results-card-image work\">\n                                <\/div>\n                                <div class=\"results-card-content-container\">\n                                    <div class=\"results-card__taxonomy-container\">\n                                        <span class=\"primary-text school\">K-12<\/span>\n                                        <span class=\"taxonomy-divider secondary-text\"> |\n                                        <\/span>\n                                        <span class=\"secondary-text service\">Marketing &amp; Branding<\/span>\n                                    <\/div>\n                                    <h3 class=\"results-card-title\">Coopersville Area Public Schools<\/h3>\n                                    <p class=\"work-card-headline\">Streamlining Coopersville&#8217;s Bronco Brand<\/p>\n                                <\/div>\n                            <\/a>\n                        <\/div>\n                    <\/div>\n                                                            <div class=\"swiper-slide\">\n                        <div class=\"results-card\">\n                            <a href=\"https:\/\/gmb.com\/work\/kentwood-public-schools\/\">\n                                <div class=\"results-card-image-container work\">\n\n                                    <img decoding=\"async\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2025\/06\/Exterior_Front-Entry-1024x576.jpg\" alt=\"\" class=\"results-card-image work\">\n                                <\/div>\n                                <div class=\"results-card-content-container\">\n                                    <div class=\"results-card__taxonomy-container\">\n                                        <span class=\"primary-text school\">Community, K-12<\/span>\n                                        <span class=\"taxonomy-divider secondary-text\"> |\n                                        <\/span>\n                                        <span class=\"secondary-text service\">Architecture &amp; Engineering<\/span>\n                                    <\/div>\n                                    <h3 class=\"results-card-title\">Kentwood Public Schools<\/h3>\n                                    <p class=\"work-card-headline\">Top of the Line Training for Athletes and Community<\/p>\n                                <\/div>\n                            <\/a>\n                        <\/div>\n                    <\/div>\n                                                            <div class=\"swiper-slide\">\n                        <div class=\"results-card\">\n                            <a href=\"https:\/\/gmb.com\/work\/geneseo-community-unit-school-district\/\">\n                                <div class=\"results-card-image-container work\">\n\n                                    <img decoding=\"async\" src=\"https:\/\/gmb.com\/wp-content\/uploads\/2025\/12\/genezeo5000-1024x576.jpg\" alt=\"\" class=\"results-card-image work\">\n                                <\/div>\n                                <div class=\"results-card-content-container\">\n                                    <div class=\"results-card__taxonomy-container\">\n                                        <span class=\"primary-text school\">K-12<\/span>\n                                        <span class=\"taxonomy-divider secondary-text\"> |\n                                        <\/span>\n                                        <span class=\"secondary-text service\">Architecture &amp; Engineering<\/span>\n                                    <\/div>\n                                    <h3 class=\"results-card-title\">Geneseo Community Unit School District #228<\/h3>\n                                    <p class=\"work-card-headline\">Vocational Programs Build Skilled Graduates<\/p>\n                                <\/div>\n                            <\/a>\n                        <\/div>\n                    <\/div>\n                                        <div class=\"swiper-slide hidden\">\n                        <div class=\"swiper-slide-placeholder\"><\/div>\n                    <\/div>\n                    <div class=\"swiper-slide hidden\">\n                        <div class=\"swiper-slide-placeholder\"><\/div>\n                    <\/div>\n                <\/div>\n                <div class=\"wl-arrow-wrapper\">\n                    <div class=\"wl-arrow-container\">\n                        <div class=\"swiper-button-prev wl-arrow-prev\"><\/div>\n                        <div class=\"swiper-button-next wl-arrow-next\"><\/div>\n                    <\/div>\n                <\/div>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/section>\n\n\n\n\n<div style=\"height:48px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"featured_media":901,"template":"","work_tag":[203,211,220,224,222,201],"school":[56],"service":[57],"focus":[268,196,198],"class_list":["post-900","work","type-work","status-publish","has-post-thumbnail","hentry","work_tag-ada-accessible","work_tag-design-workshops","work_tag-dining","work_tag-extended-learning-areas","work_tag-learning-commons","work_tag-technology","school-k-12","service-architecture-engineering","focus-community-space","focus-pre-bond-campaign-management","focus-sports-recreation"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hudsonville Public Schools - Fieldhouse - GMB<\/title>\n<meta name=\"description\" content=\"With a total of 104,000 square feet, the new Hudsonville Fieldhouse serves as the new athletics and training hub for the high school.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hudsonville Public Schools - Fieldhouse - GMB\" \/>\n<meta property=\"og:description\" content=\"With a total of 104,000 square feet, the new Hudsonville Fieldhouse serves as the new athletics and training hub for the high school.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/\" \/>\n<meta property=\"og:site_name\" content=\"GMB\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/GMB-Architecture-Engineering\/444579698921237\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-23T17:04:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N201_casestudy-edit.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"605\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/gmb.com\\\/work\\\/hudsonville-high-school-fieldhouse\\\/\",\"url\":\"https:\\\/\\\/gmb.com\\\/work\\\/hudsonville-high-school-fieldhouse\\\/\",\"name\":\"Hudsonville Public Schools - Fieldhouse - GMB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/gmb.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/gmb.com\\\/work\\\/hudsonville-high-school-fieldhouse\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/gmb.com\\\/work\\\/hudsonville-high-school-fieldhouse\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/gmb.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/5_5066_N201_casestudy-edit.jpg\",\"datePublished\":\"2024-08-02T13:17:00+00:00\",\"dateModified\":\"2025-01-23T17:04:00+00:00\",\"description\":\"With a total of 104,000 square feet, the new Hudsonville Fieldhouse serves as the new athletics and training hub for the high school.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/gmb.com\\\/work\\\/hudsonville-high-school-fieldhouse\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/gmb.com\\\/work\\\/hudsonville-high-school-fieldhouse\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/gmb.com\\\/work\\\/hudsonville-high-school-fieldhouse\\\/#primaryimage\",\"url\":\"https:\\\/\\\/gmb.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/5_5066_N201_casestudy-edit.jpg\",\"contentUrl\":\"https:\\\/\\\/gmb.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/5_5066_N201_casestudy-edit.jpg\",\"width\":1400,\"height\":605},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/gmb.com\\\/work\\\/hudsonville-high-school-fieldhouse\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/gmb.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Work\",\"item\":\"https:\\\/\\\/gmb.com\\\/work\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Hudsonville Public Schools &#8211; Fieldhouse\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/gmb.com\\\/#website\",\"url\":\"https:\\\/\\\/gmb.com\\\/\",\"name\":\"GMB\",\"description\":\"Abundance in Education\",\"publisher\":{\"@id\":\"https:\\\/\\\/gmb.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/gmb.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/gmb.com\\\/#organization\",\"name\":\"GMB\",\"url\":\"https:\\\/\\\/gmb.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/gmb.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/gmb.com\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/GMB-Logo-Full-Color.png\",\"contentUrl\":\"https:\\\/\\\/gmb.com\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/GMB-Logo-Full-Color.png\",\"width\":2400,\"height\":1200,\"caption\":\"GMB\"},\"image\":{\"@id\":\"https:\\\/\\\/gmb.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"http:\\\/\\\/www.facebook.com\\\/pages\\\/GMB-Architecture-Engineering\\\/444579698921237\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/gmb-ae\\\/\",\"https:\\\/\\\/www.instagram.com\\\/gmb_ae\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hudsonville Public Schools - Fieldhouse - GMB","description":"With a total of 104,000 square feet, the new Hudsonville Fieldhouse serves as the new athletics and training hub for the high school.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/","og_locale":"en_US","og_type":"article","og_title":"Hudsonville Public Schools - Fieldhouse - GMB","og_description":"With a total of 104,000 square feet, the new Hudsonville Fieldhouse serves as the new athletics and training hub for the high school.","og_url":"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/","og_site_name":"GMB","article_publisher":"http:\/\/www.facebook.com\/pages\/GMB-Architecture-Engineering\/444579698921237","article_modified_time":"2025-01-23T17:04:00+00:00","og_image":[{"width":1400,"height":605,"url":"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N201_casestudy-edit.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/","url":"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/","name":"Hudsonville Public Schools - Fieldhouse - GMB","isPartOf":{"@id":"https:\/\/gmb.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/#primaryimage"},"image":{"@id":"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/#primaryimage"},"thumbnailUrl":"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N201_casestudy-edit.jpg","datePublished":"2024-08-02T13:17:00+00:00","dateModified":"2025-01-23T17:04:00+00:00","description":"With a total of 104,000 square feet, the new Hudsonville Fieldhouse serves as the new athletics and training hub for the high school.","breadcrumb":{"@id":"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/#primaryimage","url":"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N201_casestudy-edit.jpg","contentUrl":"https:\/\/gmb.com\/wp-content\/uploads\/2024\/07\/5_5066_N201_casestudy-edit.jpg","width":1400,"height":605},{"@type":"BreadcrumbList","@id":"https:\/\/gmb.com\/work\/hudsonville-high-school-fieldhouse\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/gmb.com\/"},{"@type":"ListItem","position":2,"name":"Work","item":"https:\/\/gmb.com\/work\/"},{"@type":"ListItem","position":3,"name":"Hudsonville Public Schools &#8211; Fieldhouse"}]},{"@type":"WebSite","@id":"https:\/\/gmb.com\/#website","url":"https:\/\/gmb.com\/","name":"GMB","description":"Abundance in Education","publisher":{"@id":"https:\/\/gmb.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gmb.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/gmb.com\/#organization","name":"GMB","url":"https:\/\/gmb.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gmb.com\/#\/schema\/logo\/image\/","url":"https:\/\/gmb.com\/wp-content\/uploads\/2024\/08\/GMB-Logo-Full-Color.png","contentUrl":"https:\/\/gmb.com\/wp-content\/uploads\/2024\/08\/GMB-Logo-Full-Color.png","width":2400,"height":1200,"caption":"GMB"},"image":{"@id":"https:\/\/gmb.com\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/GMB-Architecture-Engineering\/444579698921237","https:\/\/www.linkedin.com\/company\/gmb-ae\/","https:\/\/www.instagram.com\/gmb_ae\/"]}]}},"_links":{"self":[{"href":"https:\/\/gmb.com\/wp-json\/wp\/v2\/work\/900","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gmb.com\/wp-json\/wp\/v2\/work"}],"about":[{"href":"https:\/\/gmb.com\/wp-json\/wp\/v2\/types\/work"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gmb.com\/wp-json\/wp\/v2\/media\/901"}],"wp:attachment":[{"href":"https:\/\/gmb.com\/wp-json\/wp\/v2\/media?parent=900"}],"wp:term":[{"taxonomy":"work_tag","embeddable":true,"href":"https:\/\/gmb.com\/wp-json\/wp\/v2\/work_tag?post=900"},{"taxonomy":"school","embeddable":true,"href":"https:\/\/gmb.com\/wp-json\/wp\/v2\/school?post=900"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/gmb.com\/wp-json\/wp\/v2\/service?post=900"},{"taxonomy":"focus","embeddable":true,"href":"https:\/\/gmb.com\/wp-json\/wp\/v2\/focus?post=900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}